RFP-24-03159-RCCR

Project Summary

  • The MM-39.45-H.75 Culvert is a 10-foot corrugated metal pipe constructed in 1987 that is showing signs of corrosion and nearing completion of its service life.
  • Additionally, the road/visibility geometry creates some functional obsolescence that needs to be addressed.
  • The culvert provides a crossing for Rapid Creek on Rapid Creek Road which is a singular primary access for several residences along with the Ute Water plant, a critical service utility for much of the Grant Valley urban area.
  • Once the design alternatives are evaluated, the consultant will be tasked with final design of the select alternative along with all supporting documents to facilitate a bid for construction.

Information Packets

Available on Monday, September 9th, 2024 

Proposals Due

5:00 p.m. - Thursday, September 26th, 2024

Apparent Selected Consultant:  River City Consultants